Thank you for your patience while we retrieve your images.


Thumbnails
Info
Photo Info

Dimensions2700 x 1797
Original file size3.08 MB
Image typeJPEG
Color spacesRGB
Date taken24-Jul-12 12:31
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3
FlashNot fired
Exposure modeManual
Exposure prog.Manual
ISO speedISO 400
Metering modePattern
Digital zoom1x

Supervised by town crew chiefs Rob Runnals and Bill Morgan, Morway's of Charlestown, N.H., disassemble the footbridge at the Randolph Recreation Field on Tuesday. The bridge, damaged by Irene flood waters, was split in two and lifted by two cranes onto flatbed trucks; it will be repaired in Charlestown and then replaced. Morgan estimated that the job would be finished by the end of August. (Herald / Tim Calabro)