Thank you for your patience while we retrieve your images.


Thumbnails
Info
Photo Info

Dimensions1997 x 3000
Original file size2.7 MB
Image typeJPEG
Color spacesRGB
Date taken9-Apr-13 12:13
Date modified10-Apr-13 09:12
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D700
Focal length200 mm
Focal length (35mm)200 mm
Max lens aperturef/2.8
Exposure1/200 at f/5.6
FlashNot fired
Exposure bias-2/3 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 400
Metering modePattern
Digital zoom1x

Ted Murphy and Pat Bates of Pine Hill Construction, based in Claremont, N.H., assemble two individual spans that make up the foot bridge at Randolph's rec fields, which was damaged during Tropical Storm Irene. The bridge was sent out to be fixed in Elmira, N.Y., and will be installed next week if weather permits. (Herald / Tim Calabro)