Thank you for your patience while we retrieve your images.


Thumbnails
Info
Photo Info

Dimensions4330 x 2887
Original file size1.33 MB
Image typeJPEG
Color spacesRGB
Date taken14-Sep-21 11:39
Date modified14-Sep-21 16:00
Shooting Conditions

Camera makeFUJIFILM
Camera modelX-T1
Focal length16 mm
Focal length (35mm)24 mm
Max lens aperturef/2.8
Exposure1/5000 at f/2.8
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 200
Metering modePattern

White River Partnership Watershed Restoration Manager Greg Russ explains the finer points of the plan to remove the Hyde dam in East Bethel. If all goes according to plan, the dam's removal will allow for an additional 60 miles of aquatic organism passage on the Second Branch. (Herald / Dylan Kelley)